How Long Does It Take to Build a Home?

At BH: Construction, where quality meets transparency, we ensure a smooth and efficient journey from start to finish. While every project is unique, here’s an overview of typical timelines for building your home:

Planning and Design (1-3 Months)

Together, we’ll define your vision, select the right design team, and finalise plans.

Site Preparation & Foundation (1-2 Months)

We’ll prepare the site and lay the foundation, setting the stage for a solid build.

Framing (1-2 Months)

Next, we build the structure, install windows, doors, and begin essential systems.

Mechanical, Electrical, and Plumbing (1-2 Months)

We’ll install the systems to ensure your home’s functionality and compliance with standards.

Interior & Exterior Finishes (2-4 Months)

From drywall to cabinetry, we’ll focus on quality finishes for both the interior and exterior.

Final Inspections & Walkthrough (1 Month)

We’ll conduct a thorough final inspection and make any last adjustments.

Move-In (1 Month)

Once all is complete, you’ll be ready to move in.

Total Timeline: 7-12 Months

Each phase is tailored to your project, and we’re here to guide you at every step. Contact us today to discuss your project and get a plan and timeline.

📞 +64 27 544 5337

🌐 build@bhconstruction.co.nz

Next
Next

Top Trends in Home Building and Renovation for 2025